Monthly Archives: April 2016

Chevron’s Gorgon LNG faces two-month shutdown

April 6, 2016 Angela Macdonald-Smith Energy Reporter Chevron’s troubles with its over-budget and late Gorgon liquefied natural gas project have escalated, with technical problems forcing a shutdown after only one export shipment and production set to be halted for up … Continue reading

Posted in Australia, Midstream, Production, Upstream | Tagged , , , , , , , | Leave a comment

Indonesia’s Small-Scale LNG Plans Face Several Challenges

by  Tim Daiss| Rigzone Contributor Friday, April 15, 2016 Last year, Indonesian President Joko Widodo set a goal for the nation’s electrification ratio to reach 100 percent by 2019, his last year in office. In order to reach this goal power … Continue reading

Posted in Indonesia, Production, Upstream | Tagged , , , , | Leave a comment

PETRONAS CEO sees bright LNG future

LNG18 Conference, Perth – Apr 11-15, 2016 Malaysian energy giant Petronas expects a bright future for the global liquefied natural gas industry despite the downturn in global oil and gas prices, the company’s CEO Datuk Wan Zulkiflee Wan Ariffin said on … Continue reading

Posted in Malaysia, Upstream | Tagged , , | Leave a comment

JGC Clinches $240M EPC Contract to Build Gas Processing Plant in Aceh

PRESS RELEASE by JGC Corp. Friday, April 01, 2016 Japan’s JGC Corporation reported Friday that its unit JGC Indonesia, jointly with PT. Encona Inti Industri, has been awarded an engineering, procurement and construction (EPC) contract for the construction of a gas … Continue reading

Posted in EPC, Indonesia, Midstream, Production, Upstream | Tagged , , , , , , | Leave a comment